Skip to product information
Modern white rectangular bathroom bathtub with an integrated L-shape design, featuring a built-in overflow and drain, ideal for contemporary bathroom decor and relaxing baths.

Nuie Square L Shape Shower Bath - White - 1500mm x 750mm/850mm, Left

Sale price  £248.94 Regular price  £556.00
  • Size: 1500mm x 750mm/850mm
  • Handed: Left
  • Bath Volume: 200L
  • SKU: WBS1585L

You may also like