Skip to product information
Chrome bath shower mixer tap with handheld shower head and flexible hose, ideal for luxury bathroom plumbing and modern bath or shower setups.

Jtp Grosvenor Wall Mounted Lever Bath Shower Mixer Tap With Shower Kit

Sale price  £354.00 Regular price  £590.00
Colour
  • Product Type: Bath Shower Mixer Tap
  • Manufacturing Material: Brass
  • Collection: Grosvenor
  • Brand: JTP
  • Height: 316mm
  • Depth: 185.5mm
  • Handle Type: Lever
  • Manufacturer's Guarantee: 15 Years
  • Water Pressure: 0.5 Bar MP
  • Number of Handles: 3
  • Inlet Connection Size: 3/4 BSP
  • Valve Type: Manual
  • Tap Operation: Standard
  • Is Waste Included?: No
  • Number of Holes: 2
  • Installation Type: Deck
  • Shape: Round
  • Style: Traditional
  • Images shown are for pictorial representation only
  • Easy to install save time and money
  • Bath Flow Rate - 0.2Bar: 9L/min
  • Bath Flow Rate - 0.5Bar: 10.5L/min
  • Bath Flow Rate - 1Bar: 12.5L/min
  • Bath Flow Rate - 2Bar: 17L/min
  • Bath Flow Rate - 3Bar: 20.2L/min
  • Shower Flow Rate - 0.2Bar: 6L/min
  • Shower Flow Rate - 0.5Bar: 7.6L/min
  • Shower Flow Rate - 1Bar: 8.8L/min
  • Shower Flow Rate - 2Bar: 12L/min
  • Shower Flow Rate - 3Bar: 15L/min
  • Traditional look into your bathroom at exceptional value
  • Waste is not included
  • Comes complete with Shower Kit
  • Suitable for Medium Pressure water systems

You may also like